Cisco Systems 2654T6 Router User Manual


 
REVIEW DRAFT—CISCO CONFIDENTIAL
Appendix A Repackaging the Router
Repackaging the Routers
A-20
Cisco XR 12416 Router Chassis Installation Guide
OL-xxxxx-xx
If you removed DC-input power entry modules, reinstall each power entry module
as instructed in the “Installing DC-Input Power Entry Modules” section on
page 3-78.
Reinstalling the Front Covers
When the router is repackaged for shipping, two foam inserts must be paced
around the top of the router. To avoid interference with the foam inserts, the front
cover for the power shelf and upper blower module should not be reinstalled on
the router. It must be placed in its original box and packaged in the accessories
boxed.
Reinstall the other front covers as instructed in the “Installing the Front Covers”
section on page 3-39.
Repackaging the Router Accessories
To protect the accessories and the router from damage during shipment, you must
repackage the router accessories in their original packaging and reassemble the
accessories boxes into a package that is packed against the back panel of the
router on the deck of the pallet body.
Repackaging the Rack-Mounting Platform
To repackage the rack-mounting platform, follow these steps:
Step 1 Remove the screws that fasten the angle brackets to the sides of the rack-mounting
platform.
Step 2 Place the screws and brackets in a plastic bag.
Step 3 Screw the threaded leveling feet completely into the legs of the platform.
Step 4 Turn the platform on its top and place it in its accessories box.
Step 5 Place the bag of screws and brackets in the accessories box.
Step 6 Place the corrugated pad foam side down on top of the platform.
Step 7 Close and seal the platform accessories box.