Ditch Witch PR95 Welder User Manual


 
PR95 Operator’s Manual Prepare - 35
Prepare Jobsite
CMW
Dig Launch and Burster Pits
Dimensions
Requirements
Exit Pit (1)
Must be in line with existing pipe.
Sloped back end aids new pipe entry.
Burster Pit (2)
Must be in line with existing pipe.
Must allow burster to be level with existing pipe.
Unit Burster Pit Exit Pit *
Length (A) Width (B) Length (C) Width (D)
U.S. (metric) U.S. (metric) U.S. (metric) U.S. (metric)
PR95 12’ (3.6 m) 5’ (1.5 m) 10’ (3 m) 3’ (1 m)
* Exit pit dimensions depend on pipe depth and product being installed.