Ditch Witch PR95 Welder User Manual


 
Burst Pipe - 46 PR95 Operator’s Manual
Push Rods
CMW
Push Rods
1. Start power unit engine.
2. Assemble pilot rod. See “Pilot Rods” on page 52.
3. Disable brake.
4. Thread 2-3 rods together.
5. Put bursting unit into push mode and push rod string into existing pipe.
6. Thread next rod onto rod string loosely.
7. Swing rod makeup device into position and place collar onto end of rod.
8. Thread onto pipe loosely.
9. Turn rotation speed/direction control to right.
10. Press engage switch until rods thread together completely.
11. Move rod makeup device clear of rod.
12. Push rod into pipe.
13. Continue threading rods together and pushing into pipe until pilot assembly enters exit pit.
IMPORTANT: If bursting unit or rod makeup device does not work,
Ensure all emergency stops are connected and disengaged.
Check all hydraulic and electrical connections.
IMPORTANT: Spray lubricant (such as WD-40) on threads of each rod every use.