Operation / 操作
30 313483A
Digital Tracking System (DTS) / 数字跟踪系统
English
Main Menu
Close cover when spray-
ing to protect display.
1. Perform Startup steps
1 - 2.
• Open drain valve
• Turn pump control
counterclockwise to
lowest setting
• Set applicator switch to
OFF
2. Start Engine, page
15. Display will
momentarily show
which pump is installed
(Base or Top) and then
Flow 1, 2, or 3 (if Base
Coat pump is
installed). Pressure
display appears, then
dashes appear when
pressure is less than
60 psi (4 bar, 0.4 MPa).
NOTE: Information other
than pressure cannot be
accessed if applicator
switch is ON. And, if sys-
tem pressure is greater
than 200 psi (14 bar, 1.4
MPa), the display will revert
back to pressure after 3
seconds.
中文
主菜单
喷涂时要关上盖子,以保护
显示窗。
1. 进行起动一节的步骤
1 - 2。
• 打开泄压阀
• 将泵控制器逆时针旋到
最低设定值
• 将喷涂器开关置于关断
位置
2. 起动发动机,见第 15
页。显示窗口会短暂显
示所安装的是哪种泵
(Base [底色漆]或
Top [面漆]),然后
显示流量 1、2 或 3
(如果所安装的是底
色漆泵)。然后出现
压力显示,当压力
小于 60 psi (4 bar,
0.4 MPa) 时,会显
示出破折号。
注释: 如果喷涂器开关
处于接通位置,则只能
显示压力,不显示其它
信息。而且,如果系统压
力超过 200 psi (14 bar,
1.4 MPa),会在 3 秒钟后
返回到压力显示。
ti5802a
ti5804a