G1022 Series Contractor Saws -21-
Figure 19. Checking V-belt alignment.
7. Place a straightedge across the arbor pulley
and the motor pulley. The straightedge
should run across both pulleys evenly as
shown in Figure 19. Adjust the motor on its
mount until pulleys are aligned, then tighten
all the mounting bolts.
Figure 20. Attaching the pulley guard.
8. Slip the pulley cover spacer over the pulley
cover mounting bolt and fit the plastic pulley
cover in place. Secure it with the wing nut
provided as shown in Figure 20.
Wiring
G1022SM and G1022Z:
The ON/OFF switch, with attached power cord
and plug, is already mounted to the saw enclo-
sure. Simply connect the quick disconnect on the
cord between the switch and motor.
G1022ZF, G1022ZFX and G1022PRO:
The ON/OFF switch on the ZF, ZFX and PRO
models mounts directly below the front fence rail.
1. Take the L-shaped bracket supplied and
position it below the front fence rail at the left
hand side of the machine. The shorter side
of the L has two holes which will align with
two holes in the fence rail. Use two Philip
®
head screws to attach the bracket. Thread
them in from underneath the rail so the
heads are not in the way of the fence travel.
2. Now attach the switch, using two Philips
®
head screws inserted through the back of the
bracket and into threaded inserts in the back
side of the switch box. Tighten these so the
switch box is secure.
3. Connect the quick disconnect on the cord
between the switch and motor.