Heath Zenith 52-4477-8 Work Light User Manual


 
4
598-1285-00
TEST 1 5 10 MIN
ON-TIME
LO - M - HI
SENSITIVITY
Junction Box
Optional Assembly
If so equipped, you may install the decorative tail
as shown below.
1. Screw hex nut onto bottom of fixture.
2. Screw extension bar into hex nut.
3. Slide tail piece and top trim piece onto exten-
sion bar.
4. Slide bottom trim piece (with drain hole) onto
extension bar.
5. Install the decorative nut onto extension bar.
Hex Nut
FINAL ASSEMBLY
1. Push the wires into the junction box. Make
sure the wires from the fixture go through the
wire path, and no wires get pinched.
2.
Slide the fixture assembly onto the mounting
screws. Tighten decorative nuts removed in step
1 of Installation section securely against fixture
base.
Mounting Screw
Decorative Nut
3. Install one medium base light bulb (100 Watt
maximum).
4. If applicable, place top cover onto fixture and
attach using the two decorative nuts (included).
Hand tighten only.
5. After completing the tests on page 4, caulk
around fixture base with silicone weather
sealant.
6. If you will not be installing the optional tail
assembly, install the decorative nut onto the
bottom of the fixture now.
Tail Piece
Trim (top)
Trim (bottom with
hole)
Decorative Nut
TESTING AND ADJUSTMENTS
1. Turn on the circuit breaker and light
switch.
Note: Sensor has a 1
1
/
2
minute warm up period
before it will detect motion. When first turned
on wait 1
1
/
2
minutes.
2. Set:
ON-TIME switch to TEST
SENSITIVITY dial to Midway