Jet Tools HBVS-7MW Cordless Saw User Manual


 
Shipping Container Contents
1 Saw
2 Wheel Axle
4 Wheel
4 Split Pin
1 Material Stop Bar
1 Material Stop
1 Belt Cover
1 Vertical Cutting Plate
Tools Required for Assembly
#2 Cross Point Screwdriver
Pliers
Unpacking and Clean-Up
1. Finish uncrating the saw. Inspect it for shipping
damage. If any damage has occurred, contact
your distributor.
2. Unboltthe saw from the skid and place it on a
level surface.
3. Clean rust protected surfaces with kerosene,
diesel oil, or a mild solvent. Do not use cellulose
based solvents such as paintthinner or lacquer
thinner. These will damage painted surfaces.
Assembly
1. Place blocking under the ends of the saw base
to allow wheel installation. Caution: Make sure
saw is steady while temporarily supported.
2. Slide wheel axles through the holes in the base.
3. Slide the wheels onto the axles and fasten with
pins. Bend the pins to hold in place.
4. Slide the material stop bar (A, Fig. 1) into the
base and secure by tightening bolt (B, Fig. 1).
Slide the material stop (C, Fig. 1) onto the bar
and tighten bolt (D, Fig. 1).
5. Slide the belt cover over the pulley assemblies
and fasten with screws and washers (A, Fig. 2).
6. Close belt cover and secure with lock knob (8,
Fig. 2).
3
Fig.1
Fig.2