OM-1314 Page 11
2-4. Installing Work Clamp
1 Insulator
2 Bolt
3 Smaller Hole
4 Work Clamp Tabs
Bend tabs around work cable.
5 Work Cable From Unit
6 Nut
Ref. ST-025 190-D
1
2
3
4
5
6
3/8, 7/16 in
Tools Needed:
2-5. Installing Gas Supply
Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.
1 Cap
2 Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3 Cylinder
4 Regulator/Flowmeter
Install so face is vertical.
5 Gas Hose Connection
Fitting has 5/8-18 right-hand
threads. Install gas hose.
6 Flow Adjust
Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
ers recommended flow rate.
7CO
2
Adapter
8 O-Ring
Install adapter with O-ring between
regulator/flowmeter and CO
2
cylinder.
Tools Needed:
CO
2
Gas
7 8
3
1
2
4
5
6
1
2
3
Argon Gas
OR
ssb3.1* 12/92 ST-158 697-A
5/8, 1-1/8 in