Miller Electric 185 Welding System User Manual


 
. Complete Parts List available at www.MillerWelds.com
OM-4415 Page 18
5-2. Grounding Generator When Supplying Building Systems
GND/PE
1 2
2
3
800 576-B
1 Equipment Grounding
Terminal
2 Grounding Cable
Use #10 AWG or larger insulated
copper wire.
3 Ground Device
. Use ground device as stated
in electrical codes.
Ground generator to system
earth ground if supplying power
to a premises (home, shop,
farm) wiring system.
5-3. Engine Prestart Checks Standard Model
Ref. 803 597B / Ref. 802 099
Full
Gasoline
1/2 in
(13 mm)
Check all fluids daily. Engine must
be cold and on a level surface. Unit
is shipped with 10W30 engine oil.
1 Fuel Valve
Open valve.
. Fuel valve is shown in the open
position. Always close fuel
valve after stopping unit. Mov-
ing unit with fuel valve open
may cause carburetor flooding
and make starting difficult.
Fuel
Add fresh fuel before starting
engine the first time (see engine
manual for specifications). Fill fuel
tank up to 1/2 in. (13 mm) from top
to allow room for expansion. Check
fuel level on a cold engine before
use each day.
Oil
After fueling, check oil with unit on
level surface. If oil is not up to full
mark on dipstick, add oil (see en-
gine manual).
Unit stops if oil level is too low. Unit
cannot be restarted until sufficient
oil is added.
Full
1