Southbend SB1022 Power Screwdriver User Manual


 
PREPARATION
For Machines Mfg. Since 8/09 Model SB1021/SB1022
-11-
PREPARATION
Preparation Overview
The purpose of the preparation section is to help
you prepare your machine for operation.
The typical preparation process is as follows:
1. Unpack the machine and inventory the
contents of the box/crate.
2. Clean the machine and its components.
3. Identify an acceptable location for the
machine and move it to that location.
4. Level the machine and either bolt it to the
floor or place it on mounts.
5. Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6. Connect the machine to the power source.
7. Test run the machine to make sure it
functions
p
ro
p
erl
y
and is read
y
for o
p
eration.
Things You'll Need
During the setup process, operation, and
maintenance of your machine, you'll need the
following items:
For Lifting
s !FORKLIFTOROTHERPOWERLIFTINGDEVICE
rated for the weight of the machine.
s ,IFTING3TRAP or Chain (rated for at least
1000 lbs.)
For Power Connection
s !QUALIFIEDELECTRICIANTOENSUREASAFE
and code-compliant connection to the
power source. (Refer to Page 16 for
details.)
For Assembly
s Cotton Rags
s Mineral Spirits
s 3AFETY'LASSES
s Oil Can with any General Machine Oil
s Blade Tension Tool
s Grease Gun with any API GL 2 Grease
s Stiff Grease Brush
s Phillips Screwdriver #2
s &LOOR-OUNTING(ARDWARE!S.EEDED
s Hex Wrench 5mm
s Hex Wrench 6mm
s Combo Wrench
1
2" or Ratchet and
1
2"
Socket
Unpacking
This item was carefully packaged to prevent
damage during transport. If you discover any
damage, please immediately call Customer
Service at (360) 734-1540 for advice. You may
need to file a freight claim, so save the containers
and all packing materials for possible inspection
by the carrier or its agent.