14
Fig. 19
Fig. 20
Fig. 21
Fig. 22
7. Lift the motor and assemble the drive belt (H) Fig. 19
to the arbor pulley and motor pulley (B). The weight of
the motor will provide the correct belt tension.
8. IMMEDIATELY AFTER ASSEMBLING
THE BELT, RAISE THE SAW BLADE TO ITS MAXIMUM
HEIGHT AND TILT THE SAW BLADE TO 45°. CHECK
TO SEE IF THE MOTOR (J) FIG. 20 IS BELOW THE
TOP OF THE TABLE SURFACE (K). IF THE MOTOR (J)
IS ABOVE THE TOP OF THE TABLE SURFACE, MOVE
THE MOTOR TO THE LEFT UNTIL THE END OF THE
MOTOR (J) IS BELOW THE TOP OF THE TABLE
SURFACE. THEN RE-ALIGN THE MOTOR PULLEY TO
THE ARBOR PULLEY.
9. Assemble the outer cover (E) Fig. 21, of the belt and
pulley guard assembly, which was removed in STEP 3,
and fasten
with external tooth lockwasher and wing nut
(D). IMPORTANT: Make certain the outer cover does not
interfere with the drive belt and the motor pulley.
CONNECTING MOTOR CORD
TO SWITCH ASSEMBLY
DISCONNECT MACHINE FROM POWER
SOURCE.
1. Insert the plug (A) Fig. 22, into the female receptacle
(B) of switch-to-motor cord (C).
2. Fig. 23, illustrates the motor cord connected to the
switch assembly.
H
B
K
J
D
E
C
A
B
Fig. 23