Jet Tools HBS-916W Saw User Manual


 
Uncrating and Cleanup
Note: Read and understandthe entire manualbefore
attempting setup or operation.
1.
Finish uncrating the saw and inspectfor
damage. Should any have occurred, contact
your local distributor.
2.
Remove all bolts attaching machine to
shipping base.
3.
Leave packing material betweenvice clamps
and saw head intact until bandsaw has been
lifted to its final position.
4.
Clean all rust protected surfaceswith
kerosene or diesel oil to remove protective
coating. Do not use gasoline, paintthinner,
mineral spirits, etc. These may damage
painted surfaces.
5.
Lubricate all slideways with SAE 1OWoil.
Installation
For best performance, the bandsawshould be
located on a solid and level foundation. Allow room
for servicing and for moving large stock aroundthe
bandsaw when deciding a locationfor the machine.
1.
Using lifting straps that are isolatedfrom the
bandsaw's finished surfaces, lift machineplace
in desired location. See figure 1 for strap
placement.
2.
Install four leveling bolts with lock nuts on both
sides of the base as shown in the parts
breakdown on page 12 - items#2 and #3.
3. Place a level on the table surface and check
side to side and front to back.
4.
Adjust leveling screws until machine is level in
both directions and tighten locking nuts.
Assembly
1.
Unbolt the motor assembly from the shipping
crate bottom.
2. Remove nut and washer from the motor
support shaft.
Fig. 1
1