Liebert gxt2u Welding System User Manual


 
Installation
11
5. Prepare the UPS or battery
cabinet (the “equipment”) for
rack mounting by following
instructions in the equipment’s
user manual. The equipment
may require additional parts to
be added or parts to be removed
for rack mounting. After it is
prepared, lay equipment in
rack-mounting position. Fasten
inner members from Step 2 to
the equipment on both sides as
shown in the figure at right
with (8) M4 screws provided in
this kit. Make sure retaining
latch is near the rear of the equipment (also shown in figure).
6. Open grease packet provided
in this kit. Apply a 1" long
bead of grease four (4) places
inside the bottom, curved
tracks of front members as
shown at right. The grease
will allow the equipment to
slide into the bracket
assemblies more easily.
7. Insert the equipment, with inner members attached from Step 5,
into bracket assemblies by inserting top and bottom edges of inner
members into the top and bottom, curved tracks of front members
and sliding the equipment into rack (see figure in Step 6). Ends of
inner members are tapered to allow rear of the equipment to be
angled upward before insertion, if space allows.
Then the rear, bottom edges of inner
members can be placed into front
edge of bottom tracks, and the front of
the equipment can be tipped up into
horizontal position to insert the top
edges of inner members before sliding
the equipment into rack (see figure at
right). The equipment should move smoothly into bracket assem-
blies. If not, recheck alignment of front and rear members from
Steps 3 and 4.
!
CAUTION
Lifting equipment into rack may be a two-person job, depending
on weight of equipment. See equipment’s user manual.
UPS or battery
cabinet
Front
M4
screws
M4
screws
Retaining
latch
UPS or
battery
cabinet
Apply
grease
(inside)
Apply grease
DISCONTINUED
PRODUCT