Lincoln Electric 11572 Welder User Manual


 
')&')+ &%*)- 
) E966?8:?6@A6C2E:?82?5>2:?E6?2?46
:?DECF4E:@?DDFAA=:65H:E9E9:D>249:?6
------------------------------------------------------------------------
& #
This unit is supplied from the factory with the engine
crankcase filled with a high quality SAE 10W/30 oil.
This oil should be acceptable for most typical ambient
temperatures. Consult the engine operation manual
for specific engine manufacturer’s recommendations.
Upon receipt of the welder, check the engine dipstick
to be sure the oil is at the “full” mark. DO NOT overfill.
,#
Fill the fuel tank with the grade of fuel recommended
in the Engine Operator’s manual. Make sure the fuel
valve on the water separator is in the open position.
&&# %*0*+$
The radiator has been filled at the factory with a 50-50
mixture of ethylene glycol antifreeze and water.
Check the radiator level and add a 50-50 solution as
needed (see engine manual or antifreeze container for
alternate antifreeze recommendations).
,+ &%

%*+##+ &%
#** R')" %*

2. Proper support of, and attachment to, the base of
the welding equipment so there will be no undue
stress to the framework.
3. Proper placement of the equipment on the trailer to
ensure stability side to side and front to back when
being moved and when standing by itself while
being operated or serviced.
4. Typical conditions of use, i.e., travel speed, rough-
ness of surface on which the trailer will be operat-
ed; environmental conditions, likely maintenance.
5. Conformance with federal, state and local laws.


Consult your federal, state and local laws regarding specific
requirements for use on public highways.
'&#) +0&%+)&#%#* 1*
With the engine off, route the electrode and work
cables through the strain relief bracket on the base
and connect to the studs located below the fuel tank
mounting rail. (See size recommendations below.)
For A@D:E:G6 polarity, connect the electrode cable to
the terminal marked UV. For %682E:G6 polarity, con-
nect the electrode cable to the UV stud. These con-
nections should be checked periodically and tightened
if necessary.
When welding at a considerable distance from the
welder, be sure you use ample sized welding cables.
)&$$%&'')#* 1*
23=6D*:K6D7@C@>3:?65#6?8E9
@7=64EC@56'=FD.@C<23=6
>AD FEJJ4=6,AE@7E>E@7E
E@>
250 100% 1 1/0
300 60% 1/0 2/0
- #$&,%+ %
>AC@A6C=J>@F?E654@?46?EC2E65=@25D>2J
42FD6F?DE23=6G69:4=692?5=:?82?5E:C6D@C@E96C
4@>A@?6?EDE@72:=
Q&?=JEC2?DA@CEE9:DBF:A>6?E@?D6CG:4623=6
G69:4=6DH9:492C6C2E652?556D:8?657@CDF49
=@25D
Q:DEC:3FE632=2?462?5D64FC6=@25DD@G69:4=6
:DDE23=6F?56C4@?5:E:@?D@7FD6
Q@?@E6I4665>2I:>F>C2E65=@25D7@C4@>A@
?6?EDDF492DDFDA6?D:@?2I=6D2?5E:C6D
Q,D62AAC@AC:2E6?FED3@=ED2?5=@4<H2D96CDE@
2EE249E966BF:A>6?E32D6E@E96>6E2=365@C
7C2>6@7G69:4=6
Q@==@HG69:4=6>2?F724EFC6CYD:?DECF4E:@?D
------------------------------------------------------------------------
.)% %
Q*E@A6?8:?6H9:=67F6=:?8
Q@?@ED>@<6H96?7F6=:?8
Q"66ADA2C<D2?57=2>62H2J7C@>
E2?<
Q@?@E=62G6F?2EE6?565H9:=6
7F6=:?8
Q.:A6FADA:==657F6=2?52==@H
7F>6D E@ 4=62C 367@C6 DE2CE:?8
6?8:?6
Q@?@E@G6C7:==E2?<7F6=6IA2?
D:@?>2J42FD6@G6C7=@H
 *#,#&%#0#@HDF=A9FC
7F6=@CF=EC2=@HDF=A9FC7F6=:?,*2?52?252
------------------------------------------------------------------------
.)% %
 *#,#
42?
42FD67:C6