Sinclair PG-239 Drill User Manual


 
INSTALLATION
The operator can work in a seated position.
The minimum space recommended is 7ft width by 5ft depth.
The machine comes with a 6 ft long cable.
WARNING: We recommend not having the power cord totally stretched.
MACHINE HANDLING
The transportation of this machine requires a series of operations.
Some of these operations may imply dangerous situations so please follow the following advise:
- Never stand beneath the cargo.
- Always lift the cargo gently.
- Avoid balancing the cargo.
- No brisk movements.
- Do not place yourself in the cargo moving trajectory.
- Use the correct equipment to move cargos.
- Check this equipment periodically.
The machine will carry packaging which is sufficient to avoid knocking or scraping any of its
components. We advise that wooden packaging, in box or cage form, should always be used, always
with adequate protection and the machine properly secured.
The machines should always travel in the vertical position and never be overturned.
UNLOADING AND LEVELLING
The machine should be unloaded by means of a crane, using ropes at both sides of the box. If the
machine comes in a box or cage, it can be unloaded using a fork lift.
When the machine is on the floor, totally unpacked, it is to be transported by means of a pallet jack
to its permanent location.
The machine comes out of the factory totally leveled, and does not need to be secured to the floor.
It incorporates rubber leg tips for it not to move with vibration during use.
The floor underneath should be firm and strong.