Delta 37-275X Biscuit Joiner User Manual


 
12
ASSEMBLING DUST CHUTE
The jointer stand has a built-in dust chute (A) Fig. 25. If this machine is to be used with a dust collection system, the
supplied dust collector connector (B) Fig. 26, can be fastened to jointer stand (C) with four #10-16x1/2" sheet metal
screws (D) as shown.
A standard 4" dust collection hose can be attached to dust collector connector.
Fig. 25
Fig. 26
A
C
D
B
OPERATING CONTROLS AND ADJUSTMENTS
STARTING AND STOPPING
JOINTER
1. The on/off switch is located underneath the switch
shield (B) Fig. 31. To start the jointer, move switch (A) up
to the “ON” position.
2. To turn the jointer “OFF”, push down on switch
shield (B) Fig. 32, as shown.
Fig. 31
B
A
Fig. 32
B