Juniper Networks C4000 Biscuit Joiner User Manual


 
Chapter 4
Powering Up the C-series Platform
This chapter describes how to power up the C-series platform. It contains the following
topics:
Powering Up on page 19
Status LEDs on page 20
The Next Step on page 20
Powering Up
NOTE: In this procedure we assume that the system is already connected to a power
source.
For specifications of the electrical requirements for the system, see System
Specifications on page 35.
CAUTION: Evaluate the overall loading of the branch circuit before you install any
equipment into a rack.
To power up the system:
1. Verify that the power source is operational and turned on.
2. Inspect all grounding and power connections to the system.
3. Confirm that all connections are secure.
4. Push the PWR button.
5. Monitor the LEDs to verify that the system is booting properly.
When the prompt appears on the system console, you can log in and configure
the system.
See the Setting the Initial Configuration on page 21 and SRCPE CLI User Guide for
more information.
Powering Up 19