Lincoln Electric SVM 119-A Welding System User Manual


 
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC
F-11
TROUBLESHOOTING & REPAIR
F-11
WIRE-MATIC 255
MAIN TRANSFORMER TEST
TEST PROCEDURE
The ON/OFF POWER SWITCH will be
"hot" during these tests.
__________________________
NOTE: Secondary voltages will vary
proportionably with the primary input
voltage.
1. Disconnect the main input power
supply to the machine.
2. Remove the Case Top and Side
Panels with a 5/16" nut driver.
3. Locate Plug J3 and Plug J6 on the
G2803 Control PC Board.
NOTE: The location of Plugs may vary
depending on the machine code.
FIGURE F.1 - G2803 Control PC
Board Main Transformer Test Points.
G2803
WM-255 CONTROL
J2
J7
J4
J10
J6
J9
J3
J5
#202
(1J3)
#204A (2J3)
#203
(3J3)
#206
(4J6)
#209
(7J6)
#208
(16J6)
J1
WARNING