Miller Electric Metro 250D Welding System User Manual


 
37OM-402
9.2 Run-In Procedure Using Load Bank
S-0683
Y Stop engine.
Y Do not touch hot exhaust
pipe, engine parts, or load
bank/grid.
Y Keep exhaust and pipe away
from flammables.
1 Load Bank
Turn all load bank switches Off. If
needed, connect load bank to 115
volts ac wall receptacle or genera-
tor auxiliary power receptacle.
2 Welding Generator
Set Amperage control at min.
3 Weld Cables
Connect load bank to generator
weld output terminals using proper
size weld cables with correct
connectors. Observe correct
polarity.
Start engine and run for several
minutes.
Set load bank switches and then
adjust Amperage control so load
and output are 180 A.
Check generator and load bank
meters after first five minutes then
every fifteen minutes to be sure
generator is loaded properly.
. Check oil level frequently dur-
ing run-in; add oil if needed.
After one hour (minimum), place
Amperage control in minimum posi-
tion, then turn off load bank to
remove load. Run engine several
minutes at no load.
Y Stop engine and let cool.
4 Engine Exhaust Pipe
Repeat procedure if wetstacking is
present.
2
3
4
1