Lincoln Electric IM528-B Welder User Manual


 
TIG MODULE
9
INSTALLATION
Ranger 9 Installation
Table 3 lists the required and optional equipment
for installing and operating the TIG Module with a
Ranger 9.
Refer to Figure 3 for the TIG Module/Ranger 9
connection diagram. Make sure all connections
are tight before proceeding.
RANGER 9 AND THE TIG MODULE
REQUIRED EQUIPMENT
Control
Cable
Work and
Electrode
Leads from
Ranger 9 to
TIG Module
TIG
Torch
Work
Lead
Shielding Gas,
Regulator,
Flowmeter
Arc Start
Switch
- OR -
Amptrol
K936-1
9-pin to 14-pin
User Supplied;
Length as Reqd.
Cable Sized to
Match Current
and Duty Cycle
User
Supplied
User Supplied;
Length as Reqd.
Cable Sized to
Match Current
and Duty Cycle
User
Supplied
See
Optional
Equipment
Below
RANGER 9 AND THE TIG MODULE
OPTIONAL EQUIPMENT
Control Cable
Extension
Water
Valve
Arc Start
Switch
Hand
Amptrol
Foot
Amptrol
Docking
Kit
K937 - [ ]
Extension
9-pin to 9-pin
K844-1
Field
Installed
K814 K963 K870 K939-1
Mounts to
Ranger 9 Roof
TABLE 3