Miller Electric Miller DU-OP Welding System User Manual


 
OM-225 590 Page 51
10-2. Run-In Procedure Using Load Bank
S-0683
! Stop engine.
! Do not touch hot exhaust
pipe, engine parts, or load
bank/grid.
! Keep exhaust and pipe away
from flammables.
! Do not perform run-in
procedure at less than 20
volts weld output and do not
exceed duty cycle or equip-
ment damage may occur.
1 Load Bank
Turn all load bank switches Off. If
needed, connect load bank to 115
volts ac wall receptacle or genera-
tor auxiliary power receptacle.
2 Welding Generator
Place Welder Selector switch in
Welder B position (600 Amps), A/V
control in minimum position, and
both Process Selector switches in
Stick/TIG position.
3 Weld Cables
Connect load bank to generator
Welder B (right) weld output termi-
nals using proper size weld cables
with correct connectors. Observe
correct polarity.
Start engine and run for several
minutes.
Set load bank switches and then
adjust generator A/V control so load
equals 350 Amps at 40 volts.
Check generator and load bank
meters after first five minutes then
every fifteen minutes to be sure
generator is loaded properly.
. Check oil level frequently dur-
ing run-in; add oil if needed.
It is recommended to run the weld-
ing generator for two hours mini-
mum and up to four hours under
load. Place A/V control in minimum
position, then turn off load bank to
remove load. Run engine several
minutes at no load.
! Stop engine and let cool.
4 Engine Exhaust Pipe
Repeat procedure if wetstacking is
present.
2
3
1
4