Woodstock W1816 Dust Collector User Manual


 
-14-
W1816 Owner's Manual (Mfg. Since 10/09)
SETUP
Note: In Steps 4–5 below, tighten the fasteners in
an alternating star pattern to obtain an even sealing
pressure on the foam tape.
4. Orient the intake barrel on the blower housing as
shown in Figure 10, then secure it in place with (12)
5
16"-18 x
3
4" hex bolts and (12)
5
16" flat washers.
7. Attach the four upper stand legs to the blower
housing brackets with (16)
3
8"-16 x
3
4" hex bolts and
(16)
3
8" flat washers, as shown in Figure 12.
Note: Make sure the open ends of the stand legs are
facing down and even with the top of the brackets.
5. Attach the cyclone funnel to the intake barrel with
(12)
5
16"-18 x
3
4" hex bolts, (24)
5
16" flat washers,
and (12)
5
16"-18 hex nuts, as shown in Figure 11.
6. Install the funnel vacuum pipe into the hole provided
on the side of the funnel with (4)
5
16"-18 x
3
4
hex bolts and (4)
5
16" flat washers, as shown in
Figure 11.
Note: The vacuum pipe can only be positioned in one
way that will allow the mounting holes to align.
The vacuum pipes and connecting vacuum hose keeps
the drum collection plastic bag from collapsing during
operation.
Figure 11. Cyclone funnel attached and
the funnel vacuum pipe installed.
Vacuum
Pipe
x 12
x 4
Figure 10. Intake barrel attached to the
blower housing.
Intake
Port
x 12
Figure 12. Upper stand leg properly
attached to the blower housing bracket.
Upper
Stand
Leg
Blower Housing
Bracket
x 16