Wagner SprayTech B_04001 Paint Sprayer User Manual


 
33
B_04012
B_04013
OPERATING MANUAL
VERSION 12/2012 ORDER NUMBER DOC 2330426
6.5.2 PRELIMINARY OPERATIONS
Open the air cuto valve and turn the regulator knob clockwise until the pump starts.
Opened
Opened
Closed
Delivery
Discharge
(Return line)
Air
Opened
Delivery
Opened
Discharge
(Return line)
Air
Opened
Start-up problems:
If the pump doesn't start up, carry out the following steps:
Close the air cuto valve.
Turn the regulator knob of the air pressure regulator o counterclockwise (0 bar pressure).
Open the air cuto valve for air.
Turn the regulator knob clockwise until the pump starts.
If necessary, repeat the operation several times.
While the pump is priming, don’t exceed with the speed.
Preliminary  ushing
The pump was tested with oil or other  uids, depending on the model.
Before use, it is necessary to wash the pump once using an adequate solvent.
Ensure that:
- The pressure regulator knob is turned fully counterclockwise (0 bar pressure).
- The air cuto valve is closed.
- The material delivery valve and the return valve, if installed, are opened.