Clarke Propane Floor Burnisher Sander User Manual


 
EN
ENGLISH
Page -10-
Clarke
®
Operator's Manual (EN) - DC Propane Burnisher
8 Hour Time Weighted Average (OSHA Method)
1.5 % 750,000cf Hours Operation 1 2 3 4 5 6 7 8
TWA (OSHA Method) 0 change/hr 5 14 27 46 69 96 128 164
1/2 change/hr 4 9 16 24 33 42 50 59
1 change/hr 3 7 11 16 20 25 29 34
2 change/hr 2 4 7 9 11 13 16 18
Based on the CO production rates shown above the TWA would not be exceeded in a
100 x 750 x 10 foot (empty) space after 8 hours with 2 air changes per hour. (Assumes no additional CO
exposure during 8 hour time period)
Maintenance of Equipment
Warning: The proper maintenance of equipment is vital to safe operation. LPG engines are dependent on
engine tune up, and air filter replacement. CO concentration (production) skyrockets when the air to fuel ratio becomes
fuel rich. Follow the recommended Maintenance Schedule for the engine found in the Engine Operator/Owner Manual as
well as the Maintenance And Adjustments schedule found in the Propane Floor Equipment Operator’s Manual that were
supplied with the equipment. Additional manuals may be obtained by contacting Clarke at 1-800-545-3454 or write to
Clarke Customer Service, 2100 Hwy. 265, Springdale AR 72764.
CO Safety Equipment Available
Envirogard automated fuel to air ratio monitoring and regulation providing an optimum combustion
Three-way type catalytic converter to scrub CO, Hydro Carbons (HC), and Nitrous Oxide (NOx) from the engine
exhaust providing the lowest possible emissions
High cubic feet per minute (CFM) fans (forced air mixing)
Digital combustion analyzers for tail pipe emissions monitoring