Exide PAR20 Work Light User Manual


 
LIST OF ILLUSTRATIONS
PAGE FIGURE DESCRIPTION
8 Fig. 1 Typical System Spacing
10 Fig. 2 Packaged Modules
11 Fig. 3 Unpacking Modules
11 Fig. 4 Handling - Lifting Strap Placement
11 Fig. 5 Handling - Module
11 Fig. 6 Typical System Arrangements
12 Fig. 7 I-Beam Hardware Installation
12 Fig. 8 I-Beam Support Installed
12 Fig. 9 Tip-Over Procedure - Shackle-Strap Usage
13 Fig. 10 Tip-Over Procedure - Photo
13 Fig. 11 Module with Base Assembly After Tip-Over
13 Fig. 12 Horizontal Stacking - Shackle-Strap Usage
13 Fig. 13 Handling and Stacking Horizontal Modules
13 Fig. 14 Hardware Installation Sequence
14 Fig. 15 Installing Hardware
14 Fig. 16 Completed Horizontal Stack
14 Fig. 17 Positioning Horizontal Base Modules
14 Fig. 18 Tie Plate Assemblies
15 Fig. 19 Stack Connections
16 Fig. 20 Terminal Plate Kit Materials & Assembly
18 Fig. 21 Protective Cover Materials & Assembly
23 Fig. 22 Sample Record Form
LIST OF TABLES
PAGE TABLE DESCRIPTION
9A Temperature Effects on Life
10 B Absolyte GX Stacking Limitations
17 C Initial Charge Voltages
20 D Float Voltage Effects on Life
21 E Equalize Charge Voltages
APPENDICES
PAGE APPENDIX DESCRIPTION
25 A Temperature Corrected Float Voltages
26 B Maximum Storage Interval Between Freshening Charges
Versus Average Storage Temperature
27 C Bonding and Grounding of Battery Rack