-42-
For Machines Mfg. Since 8/09
Model SB1019
ELECTRICAL
6. Remove the nuts that secure the metal jump-
ers on the terminal block. Stack the jump-
ers together, then place them both over the
terminals shown on the right side of Figure
47.
7. Make sure none of the wires have moved
from their original locations and the jumpers
are positioned exactly as shown on the right
side of Figure 47, then re-tighten the four
hex nuts on the terminal block.
4. Use a wire nut to connect wires #2 & #3,
then wrap them with electrical tape. Close
the motor junction box.
5. Open the pump motor junction box and
locate the motor terminal block shown in
Figure 47.
Figure 47. Rewired for 220V.
Hot
Hot
220 VAC
6-15 Plug
(As Recommended)
Pump
Motor
GND
1
1
2
2
2
3
3
3
4
1
2
3
4
1
1
2
2
3
3
4
4
4
U2
U2
V2
V2
4
Start Capacitor
3MFD 450 VAC
Limit Switch
Motor Overload
Reset Button
S. Cap
150MFD
250VAC
Saw Motor
110V
Rewired
for 220V
110V
Rewired
for 220V
(Note Jumper
Position)
Control
Box
Ground
Block
ON/OFF
Switch
(Viewed From Above)
Neutral
Hot
Ground
110 VAC
5-15 Plug
Ground
1
2
3
4
1
2
3
4
U2
V2
220
VAC
Rewired for 220V
Motor Terminal
Block
Jumpers
3. Re-tighten the wire nuts, making sure wire
#1 is still connected to the black wire com-
ing from the motor overload reset button and
that wire #4 is still connected to the red wire
coming from the cord. Wrap both wire nuts
and the end of the cords with electrical tape.
Items Needed Qty.
220V Switch (Part No. PSB1019204) ...................1
Phillips Screwdriver #2 ........................................1
Wrench 18mm .......................................................1
Wire nut (sized for two 14 Ga. wires)...................1
Electrical Tape ....................................... As needed
To convert the Model SB1019 to 220V:
1. DISCONNECT BANDSAW FROM POWER!
2. Open the motor junction box, then loosen the
wire nuts indicated in Figure 46. Remove
wires #2 & #3 from the wire nuts.
Figure 46. Wiring terminal locations.
Hot
Hot
220 VAC
6-15 Plug
(As Recommended)
Pump
Motor
GND
1
1
2
2
2
3
3
3
4
1
2
3
4
1
1
2
2
3
3
4
4
4
U2
U2
V2
V2
4
Start Capacitor
3MFD 450 VAC
Limit Switch
Motor Overload
Reset Button
S. Cap
150MFD
250VAC
Saw Motor
110V
Rewired
for 220V
110V
Rewired
for 220V
(Note Jumper
Position)
Control
Box
Ground
Block
ON/OFF
Switch
(Viewed From Above)
Neutral
Hot
Ground
110 VAC
5-15 Plug
Ground
1
2
3
4
1
2
3
4
U2
V2
220
VAC
Rewired for 220V
Wiring diagrams are provided in this section
showing the Model SB1019 wired for both 110V
and 220V. Refer to these diagrams if needed
when following this procedure.
220V Conversion
READ PAGE 41 BEFORE
DOING ANY WIRING!