Emerson VISSION 20/20 Air Compressor User Manual


 
3
Important Note
Before applying power to the control panel, all wiring to the panel should be per NEC. Specifically check for
proper voltage and that the neutral is grounded at the source. An equipment ground should also be run to
the panel.
*See Wiring Instructions and Diagrams before proceeding.
Before start-up you need to enter all system values and options. See section on Setpoint Values.