Hobart Welding Products OM-1594 Welding System User Manual


 
OM-1594 Page 30
5-6. Sequence Of Gas Metal Arc Welding (GMAW) Continuous Or Spot
Begin Welding
ssb6.1* 9/92
Install &
Connect
Equipment
Put On
Personal Safety
Equipment
Set Controls
Turn On Gas
And Water (If
Applicable)
Turn On Feeder
And Welding
Power Source
SECTION 6 MAINTENANCE & TROUBLESHOOTING
Y Disconnect power
before maintaining.
. Maintain more often
during severe conditions.
4 To 6 Weeks
Apply Conductive Grease To
Drive Roll Screw (See
Sections 6-2 And 6-7)
Conductive
Grease
3 Months
Replace
Damaged Or
Unreadable
Labels
Clean
And
Tighten
Weld
Terminals
Replace Damaged
Gas Hose
Repair Or Replace
Cracked Cables
And Cords
6 Months
Blow Out Or
Vacuum Inside
Clean
Drive
Rolls