Lincoln Electric SVM169-A Welder User Manual


 
PRECISION TIG 185
TROUBLESHOOTING & REPAIR
F-16 F-16
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC
PROCEDURE
1. Remove input power to the TIG185
machine.
2. Using the 3/8” nutdriver remove the
right side panel.
3. Locate the Spark Gap Assembly at
the right side of the machine. See
Figure F.1.
4. With the 5/64” Allen type wrench
loosen the set screw holding the
upper electrode in place.
5. Increase the distance between the
electrodes to at least 3/8” by sliding
one electrode away from the other
electrode. Secure the one electrode
in this position.
6. This should disable the high frequen-
cy circuit. Visually check to make
sure high frequency sparking is
NOT present before connecting
any test equipment to the TIG 185
machine.
7. When voltage testing and scope
measurements are complete reset
the spark gap electrodes to .020” air
gap. Tighten the set screw using the
5/64” Allen wrench.
HIGH FREQUENCY CIRCUIT DISABLE PROCEDURE
.015 Spark Gap
LEFT SIDE OF MACHINE
FIGURE F.1 SPARK GAP ASSEMBLY
.020