A SERVICE OF

logo

Fort Assembly
Phase 2
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) M72 - ROCK WALL SLAT - W100023
Hardware needed:
• (8) BV - SCREW PFH 8x2-1/4 - H100091
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 1: Attach 'M72' Rock Wall Slat to
the edges of 'E1' & 'E2' Fort Uprights
using hardware 'BV', as shown.
BV
E1
E1
E2
E2
ORIENT PRE-DRILLED HOLES
IN THE NARROW EDGES OF
'E1' AND 'E2' UPRIGHTS TO
THE OUTSIDE OF ASSEMBLY.
M72
M72
BV