Fort Assembly
Phase 7
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (1) G1 - TARP SWING BEAM CROSS BRACE - W101153
• (1) G2 - TARP CROSS BRACE - W101142
• (1) H2 - TARP UPRIGHT - W101144
• (2) K1 - TARP END CAP - W101145
• (1) M72 - ROCK WALL SLAT - W100023
• (1) E3 - TARP UPRIGHT - W101141
Hardware needed:
• (2) D - NUT BARREL WH 5/16x7/8 - H100005
• (2) AD - WASHER LOCK EXT 12x19 - H100031
• (4) AC - WASHER LOCK EXT 8x19 - H100030
• (2) H - BOLT WH 5/16x1-1/2 - H100010
• (2) L - BOLT WH 5/16x2-1/4 - H100013
• (2) BG - T-NUT 5/16 - H100074
• (12) BV - SCREW PFH 8x2-1/4 - H100091
Step 1: Attach Tarp Uprights 'H2' &
'E3" to Tarp Swing Beam Cross Brace
'G1' & Tarp Cross Brace 'G2' using
Safe-T-Fuse hardware, as shown.
Step 2: Attach Tarp End Caps 'K1' to
ends of Cross Braces 'G1' & 'G2'
using screws 'BV', as shown.
Step 3: Attach Rock Wall Slat 'M72' to
top of Tarp Uprights 'H2' & 'E3' using
screws 'BV', as shown.
G1
G2
E3
H2
BG
AC
L
D
AD
AC
H
BV
M72
K1
G2
H2
E3
G1
K1
BV
BV
These two holes in 'G1' & 'G2'
boards are not centered.
Correct installation requires the
holes to be installed as shown.
Use a 10mm drill bit
to open holes if hardware
does not fit into holes.