Contents
v
Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide
78-18579-02
Grounding the Rack 3-13
Connecting the Appliance DC Power and Ground 3-13
Grounding Connections 3-14
Power Connections 3-15
Wiring the DC-Input Power Source 3-16
Connecting the Network and Console Cables 3-18
Connecting the Network Interface 3-18
Connecting the Console 3-19
Cable Management 3-19
Powering Up the Cisco ADE 2130 and 2140 Series Appliance 3-20
Power-Up Procedure (AC Power Supply) 3-20
Power-Up Procedure (DC Power Supply) 3-21
Checking the LEDs 3-21
Removing or Replacing the Cisco ADE 2130 and 2140 Series Appliance 3-22
CHAPTER
4 Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options 4-1
Before You Begin 4-2
Preparing for a Successful Installation 4-2
Hardware Options 4-2
Tools and Supplies Needed 4-3
Beginning the Installation 4-3
Removing the Cover 4-3
Removing the Front Bezel 4-5
Installing a Hard Drive Tray into the Appliance 4-5
Removing and Installing the Processor Air Duct 4-7
Removing the Processor Air Duct 4-7
Installing the Processor Air Duct 4-9
Installing and Removing Memory 4-9
Installing DIMMs 4-11
Removing DIMMs 4-12
Removing and Installing the PCI Adapter Card 4-12
Removing the PCI Riser Assembly 4-14
Removing a PCI Adapter Card 4-15
Installing a PCI Adapter Card 4-16
Installing the PCI Riser Assembly 4-17
Installing or Replacing a Power Supply 4-17
Replacing a Redundant Power Supply 4-18
Replacing a Nonredundant Power Supply 4-19