Conair CTS 7 Saw User Manual


 
The machine is supplied to you completely lubricated. After
running the unit for long periods of time, this lubrication will
break down and become useless.
Follow this lubrication chart for optimum performance.
Component Type of Lubricant Duration
Table Pivot Bearings Chassis Lube 6-9 months
Clamp Post Slides Chassis Lube 5-6 months
Although this unit was designed to require a minimum amount
of maintenance, it should be inspected periodically to insure
that it remains in top operating condition.
Items to inspect are as follows:
- Saw Tracks- The steel tracks that the saw motor carriages
travel on, will after time, begin to wear from the constant con-
tact with the cam rollers. They should be visually inspected
for wear and replaced as necessary.
- Saw Track Rollers- The steel cam rollers that the saw motor
carriages travel on, will after time, begin to wear from the
constant contact with the saw tracks. They should be visually
inspected for wear and replaced as necessary.
- Pneumatic System- Approximately once every 12 months or
sooner if able, all system pneumatic components should be
visually inspected. All hoses should be checked for wear or
damage. All regulators and flow controls should be adjusted
through their usable ranges to insure proper operation.
MACHINE
LUBRICATION
CTS Saw UGE058/0803
4-8 OPERATION
SYSTEM
INSPECTION