Husqvarna SG13B Grinder User Manual


 
SET-UP
HUSQVARNA-15
Remove crate top and sides.1.
Remove upper handle bar assembly and lay aside.2.
Open bag containing loose hardware.3.
Using four (4) screws, at washers and nuts attach 4.
the upper handle bar assembly to lower handle
bar assembly.
NOTE: Handle t is tight. When aligning holes use
a tapered type pilot to help align holes (i.e. punch
or phillips style screw driver).
Attach the position adjusting rod to bracket on the 5.
upper handle bar assembly with the washers and
cotter pins placed above the rod bracket. Attach
the lower adjustment bar to the unit and secure
with cotter pin.
LOWER
HANDLE BAR
ADJUSTING ROD
WASHERS
SPRING
WASHERS
YOKE
BRAKE
HANDLE
BRAKE ROD ASSEMBLY
COTTER PINS
UPPER HANDLE BAR
Assemble the compression spring, two (2) at 6.
washers and yoke to brake rod assembly.
Screw yoke onto the rod assembly until rod is 7.
even or through threaded portion of yoke about ¼"
(6.35 mm).
Attach brake rod assembly to brake handle on the 8.
upper handle bar assembly.
NUT