Removing a blade server
Complete the following steps to remove a blade server from the BladeCenter unit.
Attention:
v To maintain proper system cooling, do not operate the BladeCenter unit for more
than one minute without either a blade server or a filler blade installed in each
blade bay. If you fail to replace a blade server or filler blade within one minute,
system performance might be affected.
v Make note of the bay number. Some configuration information and update
options are established according to bay; if you reinstall the blade server in a
different bay than the one from which it was removed, unintended consequences
could occur.
1. Read the “Important safety information” on page vii, “Installation guidelines” on
page 31, and “Handling electrostatic discharge-sensitive devices” on page 90.
2. Shut down the blade server operating system; then, press the blade server
power-control button (behind the blade server control panel door) to turn off the
blade server.
Attention: Wait at least 30 seconds until the drives stop spinning, before
proceeding to the next step.
3. Open the two release levers as shown in the illustration. The blade server
moves out of the bay approximately 0.6 cm (0.25 inch).
4. Pull the blade server out of the bay. Spring-loaded doors move down to cover
the bay temporarily.
5. Place either a filler blade or another blade server in the bay within two minutes.
The spring-loaded doors will move out of the way as you insert the blade server
or filler blade.
Chapter 4. Installing options 45