Miller Electric IH Welder User Manual


 
OM-203 185 Page 19
6-3. Operation
1. Energize IH/TS and power source. A coolant flow error should appear on the IH/TS display. Energize the
cooler and the error will clear from the display.
2. Set up Temperature Profile per code requirements (see Section 6-3-2 Programming The 2408 Controller).
3. Set up and start Digital Recorder
Digital Recorder (see Section 6-3-3. Batch Recording On The 5100 Digital Recorder)
4. Run the heat process (see Section 6-3-4. Running A Heat Treat and the following tables).
5. Recover from an interruption, if applicable (see Section 6-3-5. Recovering From An Interruption).
6. Retrieve data
Digital Recorder (see Section 6-3-3-4. Batch Recording On The 5100 Digital Recorder)
View and print data (see Section 6-3-6 Review Software).
Table 6-1. Controller Display Definitions
Name Description
Home List (extra parameters may be present.)
Home Measured value and Setpoint
OP
% Output level
Table 6-2. Run List Sub-Menu Definitions
run program run List
StAt Program status (OFF, run, hoLd, HbAc, End)
PSP
Programmer setpoint
SEG
Active segment number
StyP
Active segment type
SEG.t
Segment time remaining in the segment units
tGt
Target setpoint
rAtE
Ramp rate (if a rate segment)
PrG.t
Program time remaining in hours
SEG.d
*Flash active segment type in the lower readout of the home display (no/YES)
FASt
Runs through program 10 times faster than normal
*This parameter can only be changed when the program is in reset.