Southbend SB1027 Lathe User Manual


 
-12-
For Machines Mfg. Since 8/09
Model SB1027
PREPARATION
Preparation Overview Things You'll Need
During the setup process, operation, and
maintenance of your machine, you'll need the
following items:
For Lifting
• Aforkliftorotherpowerliftingdevicerated
for the weight of the machine
• Two sifting straps rated for at least 3000 lbs.
each (refer to Page 16 for details)
For Power Connection
• Aqualifiedelectriciantoensureasafeand
code-compliant connection to the power
source (refer to Page 20 for details)
For Assembly
• Cotton rags
• Mineral spirits
• Safetyglasses
• Oil can with any general machine oil
• Grease gun with any API GL 2 grease
• Stiff grease brush
• Phillips dcrewdriver #2
• Floormounting hardware as needed
• Hex wrench 5mm
• Hex wrench 6mm
• Combo wrench
1
2" or ratchet and
1
2" socket
The purpose of the preparation section is to help
you prepare your machine for operation.
The typical preparation process is as follows:
1. Unpack the machine and inventory the
contents of the box/crate.
2. Clean the machine and its components.
3. Identify an acceptable location for the
machine and move it to that location.
4. Level the machine and either bolt it to the
floor or place it on mounts.
5. Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6. Connect the machine to the power source.
7. Test run the machine to make sure it
functions properly and is ready for operation.