A SERVICE OF

logo

Drum Kit - Replacing Drum and Transfer Assembly
4-24 Ordering and Replacing Consumables
Installing the Drum
1. Make sure Lever b1 is in the OPEN position.
Use the drum handles on the top and front to insert the drum along the guide rails until it
stops, as shown in Figure 4-28. Push forward gently until the drum meets the positioning
pins.
Figure 4-28 Inserting the Drum
Top handle
Guide rails
Drum alignment
pins
Front handle
Alignment
pin holes
Lever b1