Lincoln Electric SVM170-A Welding System User Manual


 
F-13
TROUBLESHOOTING AND REPAIR
F-13
POWER MIG 255C
11.Turn the machine ON.
12. Make the following voltage tests at plug
J5.
a. Turn the machine OFF between
each test.
b. Carefully insert the meter probes
into the back of each Molex plug
pin cavity to perform the test.
c. If the voltage tested is incorrect,
check for loose or broken leads
between the test points and the
main transformer.
d. If the voltage is not corrected, go to
step 16.
13. Turn OFF the machine power.
6. Connect main input power to the
machine.
7. Turn the POWER MIG 255C ON/OFF
POWER SWITCH to ON.
8. Carefully make the following voltage
tests at plug J6.
a. Turn the machine OFF between
each test.
b. Carefully insert the meter probes
into the back of each Molex plug
pin cavity to perform the test.
9. Turn OFF the machine.
10. Locate the following leads on plug J5
on the Control PC board. See Figure
F.1.
MAIN TRANSFORMER TEST (continued)
FROM
LEAD
X5
(6J6)
X5
(6J6)
X6
(5J6)
TO
LEAD
X6
(5J6)
X7
(4J6)
X7
(4J6)
EXPECTED
VOLTAGE
15VAC
30VAC
15VAC
PLUG
LOCATION
16J5
8J5
LEAD
X8
X9
FROM
LEAD
X8
(16J5)
TO
LEAD
X9
(8J5)
EXPECTED
VOLTAGE
115VAC
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC