Powerware 9155 Tool Storage User Manual


 
EATON Powerware
®
9155 Parallel UPS (8–15 kVA) User’s Guide S 164201592 Rev C www.powerware.com
7
Chapter 3 UPS Setup
This chapter describes:
S Equipment inspection
S Floor loading and clearances
S Unloading the cabinet(s)
The instructions are intended for the chief operator/system supervisor,
electrical consultants, and installation electricians. Local regulations and
electrical code must be followed during the UPS installation.
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping
and packing materials for the carrier or place of purchase and file a claim
for shipping damage. If you discover damage after acceptance, file a
claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
NOTE Check the battery recharge date on the packaging label. If the date has expired and
the batteries were never recharged, do not use the UPS. Contact your service representative.