Powerware 9155 Tool Storage User Manual


 
PARALLEL INSTALLATION
EATON Powerware
®
9155 Parallel UPS (8–15 kVA) User’s Guide S 164201592 Rev C www.powerware.com
16
7. Punch holes for the conduit (AC input, each UPS output, and load
connection) using a Greenlee
®
punch or similar device.
8. Verify that the parallel bypass breaker is in the OFF position (see
Figure 8).
9. Mount the parallel tie cabinet to the wall and install the conduit.
Figure 8. Parallel Bypass Breaker