Cisco Systems 815 Saw User Manual


 
Chapter 2 Installation
Verifying Your Installation
2-6
Cisco 815 Integrated Services Router Hardware Installation Guide
OL-9558-01
Step 2 Connect one end of the separate power cord to the socket on the power supply.
Step 3 Connect the other end of the separate power cord to a power outlet.
Step 4 Press the router power switch to ON ( | ).
Step 5 Confirm that the router has power by checking that the PWR LED on the front
panel is on.
Verifying Your Installation
You can verify that you have correctly installed the router by checking the
following LEDs:
PWR (front panel)—On when power is being supplied to the router.
OK (front panel)—On when the router software is loaded and functional.
Blinking indicates that the router is performing a power-on self-test (POST).
WIC0/WIC1 OK (back panel)—On when the WIC is correctly installed in the
corresponding WIC slot.
ETH ACT (front panel)—Blinking when there is network traffic on the local
10/100 Ethernet LAN.
WIC0 ACT or WIC1 ACT (front panel)—Varies, depending on the WIC
installed. See Table 1-4 in Chapter 1, “Overview.”
LINK (back panel)—On when the router is correctly connected to the local
Ethernet LAN through the 10/100 ETHERNET port.
MOD OK (back panel)—On when the VPN hardware encryption module is
installed and recognized by the Cisco IOS software.
1
Power supply
2
Power socket