Cisco Systems ASR 901 10G Saw User Manual


 
2-7
Cisco ASR 901 10G Series Aggregation Services Router Hardware Installation Guide
OL-28105-02
Chapter 2 Preparing to Install the Router
Site Planning
Warning
Only trained and qualified personnel should be allowed to install or replace this equipment.
Statement 49
ESD-preventive cord and wrist strap.
Number 2 Phillips screwdriver.
Flat-blade screwdrivers: small, 3/16-inch (0.476 cm) and medium, 1/4-inch (0.625 cm).
To install or remove modules
To remove the cover, if you are upgrading memory or other components
Number 12-24 pan-head screws to secure the router to the equipment rack.
Cables for WAN and LAN port connections (depending on the configuration).
Note For more information on cable specifications, see Appendix B, “Cable Specifications”
Ethernet hub or PC with a network interface card for connection to the Ethernet (LAN) ports.
Console terminal (an ASCII terminal or a PC running terminal emulation software), which is
configured for 9600 baud, 8 data bits, no parity, and 2 stop bits.
Console cable for connection to the console port.
Ratcheting torque screwdriver with a Phillips head that exerts up to 15 pound-force inches (lbf-in)
of pressure.
Crimping tool as specified by the ground lug manufacturer.
16-AWG copper wire for the power cord.
Wire-stripping tools for stripping both the 6-AWG and 18-AWG wires.
Serial interfaces may require a channel service unit or a data service unit (CSU/DSU).
Installation Checklist
To assist you with your installation and to provide a historical record of completed tasks and users, use
the following installation checklist. Make a copy of this checklist and mark the entries as you complete
each task. When the checklist is completed, include a copy of the checklist for each router in your site
log along with other records for your new router. See Appendix C, “Site Log” for information on the site
log, including a sample site log.
Installation Checklist for Site:
Router Name:
Task Verified by Date
Installation checklist copied
Background information placed in site log
Site power voltages verified
Installation site power check completed
Required tools available