Westinghouse IL 33-DAH-1 Power Hammer User Manual


 
Effective December, 1998
IL 33-DAH-1
Page 9
Step 11: Installing the 2-Point Terminal Block
A. Mount the 2-Point Terminal Block to the
pre-drilled holes in the right Trip Unit Support
Bracket as shown, using the (2) .138-32 × .750"
screws, (4) flat washers, (2) lock washers, and
(2) nuts supplied.
B. Route the DTA wires from the DTA Assembly to
the 2-Point Terminal Block. After assuring the
wires are clear of any moving components
within the Breaker, connect the DTA wires to
the 2-Point Terminal Block.
For Kits Supplied with a Breaker Mounted
CPT Only.
Step 12: Installing the Breaker Mounted CPT
A. Align the holes in the Breaker Mounted CPT
with the predrilled holes on the left side of the
Trip Unit Mounting Platform. Secure the CPT to
the Trip Unit Mounting Platform using the (4)
.190-32 × .500" screws, (8) flat washers, (4)
lock washers, and (4) nuts supplied. Note that
the X1 and X2 terminals face the front of the
Breaker.
B. Insert the black plug of the CPT Harness into
the receptacle in the Trip Unit.