We wish to thank you for purchasing the Digitrip Retrofit System. Digitrip Retrofit Kits are designed and manufactured in
America with pride. All the components are engineered to fit the existing Circuit Breaker with little or no modifications to
the existing Breaker. However due to the wide variety and vintage of Breakers in use today, an occasional problem may
arise. Please contact us with any questions, comments or concerns.
Phone: 1-800-937-5487 Fax. (724) 779-5899
The instructions for installation, testing, maintenance, or repair herein are provided for the use of the
product in general commercial applications and may not be appropriate for use in nuclear applications. Additional
instructions may be available upon specific request to replace, amend, or supplement these instructions to qualify
them for use with the product in safety-related applications in a nuclear facility.
The information, recommendations, descriptions, and safety notations in this document are based on
Cutler-Hammer’s experience and judgement with respect to retrofitting of power breakers. This information should not
be considered to be all inclusive or covering all contingencies. If further information is required, Cutler-Hammer should
be consulted.
NO WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR
PURPOSE OR MERCHANTABILITY, OR WARRANTIES ARISING FROM COURSE OF DEALING OR USAGE OF
TRADE, ARE MADE REGARDING THE INFORMATION, RECOMMENDATIONS AND DESCRIPTIONS
CONTAINED HEREIN. In no event will Cutler-Hammer be responsible to the user in contract, in tort (including
negligence), strict liability or otherwise, for any special, indirect, incidental, or consequential damage or loss
whatsoever, including but not limited to damage to or loss of use of equipment, plant or power system, cost of capital,
loss of profits or revenues, cost of replacement power, additional expenses in the use of existing power facilities, or
claims against the user by its customers resulting from the use of the information, recommendations, and descriptions
contained herein.