Basic Operation
34 3A0868G
8. Purge as follows:
• Purge component A side. Press the manual
override on the Dose Valve A solenoid valve
and trigger the gun into a grounded metal pail.
• Purge component B side. Press the manual
override on the Dose Valve B solenoid valve
and trigger the gun into a grounded metal pail
until clean solvent flows from the gun.
• Repeat to thoroughly clean the mix manifold.
9. Reinstall the Control Box cover.
10. Shut off the solvent fluid supply.
11. Disconnect the solvent supply lines and reconnect
the component A and B fluid supplies.
NOTE: The system remains full of solvent.
F
IG
. 19. Solenoid Valves in Control Box
Manual overrides
ti15730a
Solvent Valve A
Solenoid
Dose Valve A
Solenoid
Solvent Valve B
Solenoid
Dose Valve B
Solenoid
Gun Flush Box Solenoid
location, if used.