Grizzly G0768 Lathe User Manual


 
-20-
Model G0768/G0769 (Mfd. Since 8/15)
SECTION 3: SETUP
Your machine was carefully packaged for safe
transportation. Remove the packaging materials
from around your machine and inspect it. If you
discover any damage, please call us immediately
at (570) 546-9663
for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi-
tion of your shipment, inventory the contents.
Unpacking
The list below outlines the basic process of setting
up the machine for first-time operation. Specific
steps are covered later in this section.
The typical setup process is as follows:
1. Unpack machine and inventory contents of
box/crate.
2. Clean machine and its components.
3. Move machine to an acceptable location.
4. Assemble machine and make sure it is ready
for operation.
5. Connect machine to power source.
6. Test run machine and various safety compo-
nents to ensure they function properly.
7. Perform spindle break-in procedure to pre-
pare spindle bearings for operational loads.
Setup Overview
SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.
The following are needed to complete the setup
process, but are not included with your machine.
Description
Additional People
Safety Glasses
Cleaner/Degreaser (Page 22)
Quality Metal Protectant
Disposable Shop Rags
Forklift
Lifting Slings (rated for at least 300 lbs.)
Mounting Hardware (Page 25)
Needed for Setup