Samsung 7100 Battery Charger User Manual


 
OfficeServ 7100 Installation Manual
© SAMSUNG Electronics Co., Ltd. 2-1
CHAPTER 2. Installing Cabinets
This chapter describes how to install an OfficeServ 7100 cabinet on the ground, inside rack
or on a wall depending on the installation environment.
2.1 Procedure for the System Installation
The procedure of system installation is as follows:
1) Install the cabinet on the ground, inside rack or on a wall depending on the installation
environment.
2) Ground to the ground lug behind the basic cabinet.
3) Insert the MP10/11 board into the slot 0 of the basic cabinet.
4) Insert various interface boards into the universal slots(slot 1 and slot 2).
5) Connect an external battery.
6) Connect input power of AC 230 V..
2.2 Selecting Installation Method
The OfficeServ 7100 cabinet can be installed on the ground, inside a 19-inch rack or on a
wall depending on the number of cabinets and environment of the installation area.