Samsung 7100 Battery Charger User Manual


 
CHAPTER 3. Ошибка! Стиль не определен.
3-10
© SAMSUNG Electronics Co., Ltd.
3.3.1.5 PLIM Board
The OfficeServ 7100 system does not support the power to the PLM board. Therefore, the
PLIM board does not support PoE and only performs the same function as that of the LIM
board.
When the PLIM board is used, the board should be mounted after removing Shunt pin J1,
J2 and J3 supplying the PoE Power.
Figure 3.10 PLIM Board
J1
1
J2
J3
1
1