Cisco Systems 7600 Router User Manual


 
CHAPTER
3-1
Cisco 7600 Series Router Supervisor Engine and Route Switch Processor Guide
OL-10100-04
3
Installing and Configuring Route Switch
Processors and Supervisor Engines
This chapter describes how to install and configure a route switch processor or supervisor engine. It also
provides instructions for connecting to the console and uplink ports on the module.
This chapter contains the following sections:
Preparing for Installation or Removal, page 3-1
Determining Module Location, page 3-3
Installing a Supervisor Engine or Route Switch Processor, page 3-4
Removing a Supervisor Engine or Route Switch Processor, page 3-7
Hot Swapping (OIR) Modules, page 3-8
Connecting to the Console Port, page 3-9
Connecting to the Uplink Ports, page 3-10
Using Flash Memory Cards, page 3-12
Power Management and Environmental Monitoring, page 3-14
Determining Software Feature Support, page 3-14
Configuring a Supervisor Engine or Route Switch Processor, page 3-14
Preparing for Installation or Removal
Before you attempt to install a supervisor engine or route switch processor in the router, be sure to:
Review the safety precautions and electrostatic discharge guidelines in the “Safety Precautions for
Module Installation and Removal” section on page 3-2 and the “Preventing Electrostatic Discharge
Damage” section on page 3-2.
Make sure you have on hand the tools required for the installation. (See the “Tools Required for
Module Installation” section on page 3-3.)
Determine which chassis slot to install the module in. (See the “Determining Module Location”
section on page 3-3.)
Consider cabling for the console and uplink ports. (See Appendix B, “Cable and Connector
Specifications.”)